Agios Nikolaos is commissioning a scientific investigation of the tunnel beside Lake Voulismeni following approval of an agreement with the Municipal Port Fund and the National Technical University of Athens. The study will document the tunnel’s condition and assess what would be needed for any future use.

What the university will examine

Researchers will scan and digitally map the tunnel in three dimensions, record damage and create a photorealistic model. Geological surveys and laboratory tests will examine moisture, erosion and how the materials behave.

The data will inform simulations and technical proposals on structural safety and the feasibility of controlled visitor access. The study does not authorise an immediate public opening.

Budget and timetable

The contract is worth €40,000 including VAT and runs for nine months from signature. The municipality says the findings will inform further studies and works. A public presentation is planned.

The project aims to preserve a distinctive feature of the town’s engineering history while examining how people could visit it safely. The next steps depend on the university’s findings and the necessary approvals.

The accompanying image is an original Kriti.News AI illustration. It does not show the actual tunnel or fieldwork.

Δήμος Αγίου Νικολάου — Η προγραμματική συνεργασία για τη Στοά της Λίμνης Βουλισμένης