Traffic arrangements apply to BOAK Rethymno, in the Petres–Gerani area, due to resurfacing work. The General Regional Police Department of Crete announced a narrowing of the lanes from the 48+300 to the 49+800 position, with effect until 16 December 2026.

What's true in the Petres–Gerani area

The notice does not provide for full closure of this section for the entire duration of the work. Drivers, however, need to calculate limited lane width and follow the temporary marking and instructions of traffic police officers.

The test on the Geropotamos Bridge

Separately, traffic in both directions on the Geropotamos Bridge was halted for 20 minutes, from 00:00 to 00:20 on 20 November, for load testing under the Region of Crete’s Smart Bridges project. The bridge test was separate from the continuing lane restrictions between Petres and Gerani.

Rethymnou Police Department calls for increased attention to the points of the projects. Drivers are invited to adapt their speed to conditions and check for any newer notices prior to the route.

The image is an original AI illustration and is not a photographic evidence of the actual bridge or work.